The Port Authority of Bilbao has awarded the construction of what will be the Port of Bilbao’s Ro-Ro Ramp Number 8 to Astilleros Zamakona, at a cost of 2.74 million euros, with an execution period of some six months.
The ramp will have a load capacity of 250 tonnes and will provide on-request services.